Resetting a Base And Offsetting Lines Beyond Obstructions
A metal chimney, power ventilator, skylight, brick chimney, dormer, etc., will cut the courses off from the original base and offset lines. The courses below the obstruction continue across the roof uninterrupted to the far rake. You want the keyways of the courses broken by the obstruction to line up exactly with the keyways of the continuous courses. Let me show you two obstruction situations and how to establish new verticals in each case.

POWER VENTILATOR

Your baseline and offset line are to the left side. The size of the unit breaks the continuity of six courses. Lay the six courses up the left side of the unit and cut and trim them as shown. Carry the seventh course on across the top of the unit, nesting the tops of the new shingles to old shingles. Once you get to the top of the unit, nail the shingles in course 7 high. (“Nail the course high” by driving the nails at the top of the shingle, keeping the nails in a line directly above the keys.) Carry course 7 on beyond the power ventilator two (or three or four) shingles and stop laying in that course. When you stop laying in that course “leave the end loose.” (“Leaving the end loose” means you don’t drive the fourth nail at the end of the shingle.) Now bring the eighth, ninth, tenth, and eleventh courses on across, stopping them when you have laid the same number of shingles you laid in the seventh course. Nail courses 8,9,10 and 11 in their normal positions above the keys, but leave the ends loose on each of these courses. Drive a nail directly above the end of the last shingle on course 11. Hook a chalk line to the nail and run the line down across the gap the power ventilator caused in the courses. Hold the chalk line down several courses into the courses that continued uninterrupted below the power ventilator. Make sure it lines up with the ends of courses 9 and 7 above the power ventilator. Pull the line tight and pop it. You have the new baseline. Now lay the same number of shingles for course 12 as you did for the others coming across the top of the power ventilator. Nail directly above the end of the last shingle on course 12. Hook the chalk line, centering the line on the appropriate keyways on the uninterrupted courses, and pop a new offset line across the gap. Lay the shingles back toward the power ventilator and trim them in. You “nailed high” on course 7, so you can slide the shingles for course 6 directly under the shingles of course 7 and set them on the offset line to trim them into the power ventilator. Nail the shingles in course 6 normally. As you continue courses 7, 8, 9, 10,11and 12, you can butt the next shingle into its proper position because you “left the ends loose” on these courses. Of course, if you are overlaying the old roof, you nest the new shingles to the old shingles to carry the horizontal courses. If a tear-off has a big obstruction, just measure and pop lines for 5-inch courses up both sides of the obstruction. Going up as many courses as possible above the power ventilator before you nail above the end of the shingle, and going down several courses on the uninterrupted shingles (to hold on the keyways) gives you more accurate lines than just holding the line across one or two shingles at the top of the gap and one or two shingles at the bottom of the gap. When you use this method of redoing the verticals, the keyways will turn out straight—as if there had never been a power ventilator in the way at all.

OBSTRUCTIONS AT THE RIDGE OF THE ROOF

An obstruction such as a brick chimney can reach the ridge of the roof. In a case like that, lay uninterrupted courses across the bottom of the roof. Go several courses down from the last uninterrupted course you laid and find the end of a shingle in one course down from a baseline course. Carefully set the nail hook under the full tab, making sure it is centered exactly below the joint where the two shingles in the base course above are butted together. Pull the chalk line gently straight up the roof and lay the line down. Now weigh the hook down under the tab with a bundle of shingles and pull the chalk line directly up the roof. Pull it snugs, centering it over the keyway of the several courses above where you have it hooked. Hold it up at the ridge and pop the new baseline. Set the nail to hook up or down one tab, centering it directly below the butted joint of shingles in an offset course. Repeat the process and pop the offset line all the way to the ridge. Lay the courses back from the new verticals and tie the shingles into the obstruction. Then continue on across the roof. If the bottom edge of a tab gets nicked when you pull the chalk line against it, push it down smooth with your finger or tap it smooth with a hammer. (Someone else holding the chalk line makes all this easier: he can hold the chalk line directly over the butted joint. I have described the method for setting the nail hook to pop a chalk line when you are working singlehanded. You will probably have to set and weigh the nail hook more than once to get the chalk line to pull right over the joints.)

Online Roofing Calculator

Roof Elements
Brick Chimneys and Roof Skylights

You are probably worried about flashing your brick chimney. Chimneys come on like an 800-pound gorilla and are responsible for a large number of do-it-yourself roofing projects which were never started. The method we will use to flash and tie in a chimney is very straightforward: you will be pleased with the outstanding (no-leak) results. You will be shown the way up and around the chimney, and my figures will put you on the roof doing each step.
Someone wise once said, Worry is sadistic entertainment.” He was right. We’ve come this far together, so relax and let’s enjoy ourselves as we tie in a chimney.

There are several steps to flashing a chimney. It takes the time to trim and fit the various components. It’s not complicated, it just takes time. You can easily spend four to six hours on your chimney, so get rid of any idea that you must complete it in two hours. The test of your work is not how fast you do it, but whether it leaks and whether it lasts.
More…

Materials
All you need to know about Roof Valleys

You should install a metal valley on the roof. You can go to a “Double Weave” or a “California Cut” valley if you want to, but a metal valley is far nicer looking and it’s definitely more durable.
No matter what surface finish you use for a valley, the underlayment is done the same way. The Building Code calls for No. 30felt to be run down the flow line of the valley and the standard No. 15 felt laid into it from the sides. A better alternative to No. 30 felt is modified bitumen or rolled roofing.
Modified bitumen comes in a roll and is heavier and more expensive than rolled roofing. As you saw when we flashed the chimney, I prefer to use the modified bitumen.
Rolled roofing is either asphalt and fiberglass or a rubberized compound. It has a grit surface like shingles. Rolled roofing is designed as a finished roofing surface itself. It is approximately 40 inches wide and rolls out like the roofing felt. Rolled roofing is thick and tough. It won’t tear, it won’t get a hole punched in it, and it won’t fail in the valley.
More…

Materials
Roofing Caps, Ridge Valleys and Vents

Roofing Caps and Vents

The ridge of a roof is another trouble-prone area. In a severe high wind (such as a hurricane), the wind buffeting the side of a house takes the line of least resistance and races up and over the ridge of the roof. The result is that the shingles along the ridge are hit with a greater force and experience more severe pressure than the shingles anywhere else on the roof. The treatment of the ridge and laying of the cap pieces require special attention. On a complete tear-off or brand new home, everything should be double-overlapped on the ridge, starting with the roofing felt. Lap 1 foot of the felt from the rear roof over the ridge and staple it to the front sheathing. Lap 1 foot of the felt from the front roof and staple it to the felt underlayment and sheathing on the rear roof. You will overlap the tops of the courses of shingles the same way you do the felt. Let me point something out. More…
Materials
Selecting Your Roofing Materials

Select proper material for your roof. Learn the pros and cons of each.

SHINGLES.
Stay away from the standard twenty-year shingle. Use a heavier duty, self-sealing, twenty-five-year, three-tab shingle. Most manufacturers’ thirty-year and thirty-five-year shingles are dimensional shingles with the rough surface that simulates a wood shake roof. I don’t have scientific data to prove it, but it’s logical that the rough surface gives extremely high winds a place to begin tearing off the roof. I suspect that the wind resistance caused by the rough surface more than offsets the strength of the extra thickness of the thirty- and thirty-five-year shingles.
More…

Roofing Work
Roofing Job Cleanup

Cleaning up the job is more than just a matter of aesthetics. Gently sweep down the roof as you finish each section. You won’t be able to see all of the flaws in the shingles or the “fish mouths” while you are standing on the roof.
Have someone on the ground sight up the slope of the roof and direct you to the raised shingles. You can help the person on the ground by holding your hammer vertically down on the roof and standing to one side. Lift the raised tab and remove any trash or loose grit and drive down the nail if it isn’t seated flush with the surface of the shingle. Remove all scrap pieces so they don’t stick down to or get stepped down into your new shingles. Don’t wait until you have done the whole roof to do the detail cleanup. If you wait, you may discover that the tabs are already sealed down, and some scraps have stuck to and stained your new shingles.